Wednesday, December 31 2014

Under the provisions of the Home Building Contracts Act 1991 Your Builder MUST:

Perform the home building work in a proper and workmanlike manner, in accordance with the contract, supply materials that are of merchantable quality and reasonably fit for the purpose for which the owner requires.

Our report will identify if any of these things have not been done so that you can get the work rectified by your builder or seek legal advice based on the findings.

Posted by: SHS Building Consultants AT 06:24 pm   |  Permalink   |  0 Comments  |  Email
Comments:

Post comment
Name
 *
Email Address

Message
(max 750 characters)
*
* Required Fields
Note: All comments are subject to approval. Your comment will not appear until it has been approved.

Time limits on complaints for Building Work.

There are essentailly two reasons why you would have a building complaint. They are:

  • You have been adversely affected by building work (this can be a builder you hired or even one that your neighbours have engaged).
  • You have a contract dispute.

As set out in the Building Services (complaint Resolution and Administration Act 2011

Building Services Complaint:

A building service complaint must be made within 6 years after the completion of the regulated building service to which the complaint relates. This means 6 years from Pratccial Completion. It is interesting to note that a Building Services complaint may be made by sebsequent owners for a period of 6 years after PCI.

An example of a Building Services complaint is if the neighbours engaged a builder to construct a new home and the stormwater drainage is affecting your property.

Another example is if you hired a builder to install some new windows and they have begun to crack within 6 years.

If the builder attends to fix something, you get another 6 years waranty 


A Breach of Contract:

You have 3 years to lodge a claim for a contract dispute.

An example may be that you requested a specific brand of tile and it was not installed or the builder did not finish the home building work on time.