Wednesday, January 07 2015

If the regulation or requirement pertaining to a particular defect is referenced within the Building Code of Australia then it is considered that a breach of the building code has occured. Compliance with The Building Code of Australia is mandatory and enforcable by law and at the Building Commission. Generally components of a structural nature (brick work, roof framing, waterproofing etc..) are referenced within the Building Code of Australia.

Although some standards are not referenced within the Building Code of Australia they may be used to establish whether your builder has undertaken the work in a proper and tradesman like manner and the report may still be used to identify defective work or used at the Building Commission as an expert witness report. Generally items which are secondary to structural components (kitchen cabinetry, plastering, skirting boards etc.) are not referenced within the building Code of Australia.

Posted by: SHS ADMIN AT 11:54 pm   |  Permalink   |  0 Comments  |  Email
Comments:

Post comment
Name
 *
Email Address

Message
(max 750 characters)
*
* Required Fields
Note: All comments are subject to approval. Your comment will not appear until it has been approved.

Time limits on complaints for Building Work.

There are essentailly two reasons why you would have a building complaint. They are:

  • You have been adversely affected by building work (this can be a builder you hired or even one that your neighbours have engaged).
  • You have a contract dispute.

As set out in the Building Services (complaint Resolution and Administration Act 2011

Building Services Complaint:

A building service complaint must be made within 6 years after the completion of the regulated building service to which the complaint relates. This means 6 years from Pratccial Completion. It is interesting to note that a Building Services complaint may be made by sebsequent owners for a period of 6 years after PCI.

An example of a Building Services complaint is if the neighbours engaged a builder to construct a new home and the stormwater drainage is affecting your property.

Another example is if you hired a builder to install some new windows and they have begun to crack within 6 years.

If the builder attends to fix something, you get another 6 years waranty 


A Breach of Contract:

You have 3 years to lodge a claim for a contract dispute.

An example may be that you requested a specific brand of tile and it was not installed or the builder did not finish the home building work on time.