What types of inspections and building reports do SHS Building Consultants undertake?

  • Causation Reports

           

A fully detailed SHS building causation report will supply the client with an unbiased answer as to “what” happened in an alleged event to cause the damage to people or property. An SHS causation report will address the event itself, the cause of the damage to a building or person and also identify what damage has resulted – including the type of damage expected from the event and any alleged damage from the event. The report will also identify what should be done to rectify the defect so that it does not continue to contribute to similar damage.

  • Building Defects and Defective Building Work

Building defects are common to many buildings and are inspected in order to determine if the method of construction has contributed to the event or any resultant damage. To determine defective building work the Building Code of Australia, Australian Standards and Manufacturer Installation Guides are referenced within the report.

  • Home Owner Warranty

Home owner warranty is a legislated building warranty that applies to all new buildings for 6 years from handover. In Western Australia builders must warranty their work, If the builder dies or becomes insolvent the insurance provider becomes responsible (within certain time and cost limits) to rectify resultant damage caused by defective building work. The Building Code of Australia, Australian Standards and Manufacturer Installation Guides are referenced within the HOW report to identify defective building work (the building contracts are referenced to establish responsibility) and therefore any implied breach which may warrant rectification work to be undertaken.

*Other reports are available on request and can be tailored to our client’s specific needs.

Posted by: AT 08:41 pm   |  Permalink   |  Email

Time limits on complaints for Building Work.

There are essentailly two reasons why you would have a building complaint. They are:

  • You have been adversely affected by building work (this can be a builder you hired or even one that your neighbours have engaged).
  • You have a contract dispute.

As set out in the Building Services (complaint Resolution and Administration Act 2011

Building Services Complaint:

A building service complaint must be made within 6 years after the completion of the regulated building service to which the complaint relates. This means 6 years from Pratccial Completion. It is interesting to note that a Building Services complaint may be made by sebsequent owners for a period of 6 years after PCI.

An example of a Building Services complaint is if the neighbours engaged a builder to construct a new home and the stormwater drainage is affecting your property.

Another example is if you hired a builder to install some new windows and they have begun to crack within 6 years.

If the builder attends to fix something, you get another 6 years waranty 


A Breach of Contract:

You have 3 years to lodge a claim for a contract dispute.

An example may be that you requested a specific brand of tile and it was not installed or the builder did not finish the home building work on time.

0401 953 226